Hydroelectric Power

Ingwa Khola hydroelectric project

Ingwa Khola hydroelectric project

The Bank of Kathmandu will finance the Upper Ingwa Khola Hydroelectric project.
This project has an installed capacity of 9.7MW and will generate electricity from Ingwa river located in Taplejung. The estimated cost is € 23.5 Mill.

Ingwa Hydropower is constructing the project in Yangbarak and Sidingba villages, located in the Taplejung and Panchthar districts.

The total supply for this project will be of two 5.5 MW Gamesa Electric synchronous hydro generators.

This is 6TH time this client has trusted our products and team capabilities as together, we have installed a total of 145 MW, all of them in Nepal.

Ingwa Khola Hydroelectric project
Location Yangbarak and Sidingba villages, Taplejung and Panchthar districts | Nepal
Year 2022
Power 9.7MW
Total supply 2 x 5.5MW Synchronous Hydro Generators