Solar

Los Prados solar PV plant

Los Prados solar PV plant

Los Prados solar PV plant

Los Prados photovoltaic power plant in (Honduras), started its commercial operations in October 2018. The plant has installed Gamesa Electric Photovoltaic Solar Stations.
The project is part of an energy sale agreement (PPA) with the National Electric Energy Company (ENEE) of Honduras for 20 years and which is expected to provide 73,000 MWh of electricity per year and to reduce carbon emissions by nearly 40,000t per annum.

It includes 24 of our 1000V photovoltaic inverters distributed in 13 Solar Photovoltaic Stations (11 x PV Stations with 2 inverters + 2 x PV Stations with 1 inverter). The total DC power of the project is 35 MW. In addition, through our Power Plant Controller (PPC), we ensure grid code compliance and dispatch communication with the electric grid manager.
The client relied on Gamesa Electric for this project based on our experience in the photovoltaic sector and factors such as our ability to comply with the country’s grid connection codes.

Los Prados
Location Honduras
Year 2018
Power 35 MW
Total supply 11 x 2 inverters solar PV Stations
2 x 1 inverter solar PV Stations
PV Controller