Gamesa Electric

 

Search news

Data range:


 

News

01 October 2012

  • This is the first contract in the country, a market that shows big growth opportunities

01 October 2012

  • The project marks and important milestone in the internationalization of the company, after the Laguna Verde installation, in Mexico

21 September 2012

  • It participates with a conference about ‘PV Central Inverters & Weak Grid Support’, on September, 25th 

04 July 2012

  • The ESSAR 1 MW photovoltaic farm, Bhuj in the state of Gujarat 

14 June 2012

  • It incorporates an advanced control card similar to those used in wind turbine converters

12 June 2012

  • Notable for its reduced size, an extremely low acoustic, double the normal resistance to collisions and the capacity to continually supply maximum power 

08 April 2012

  • The project will generate 70 MW of green energy produced by hydraulic turbines
  • The agreement with the Austrian company ANDRITZ HYDRO transferred the technologies developed by Gamesa to hydraulic applications for the latest generation of G10X 4.5 MW wind turbines

Results 61 - 70 of 72